Skip to content
PropTech HQ

Project Guides

Silva at Dubai Creek Harbour: Prices, Payment Plan and Buyer’s Guide

5 November 2026 · 5 min read

Silva residential tower by Emaar at Dubai Creek Harbour at sunset

Silva is Emaar's collection of 434 one- to three-bedroom apartments and three-bedroom townhouses in the Green Gate District of Dubai Creek Harbour, with private balconies and panoramic terraces over the creek, skyline and greenery. Apartments range from 740 to 1,834 sq ft and townhouses reach 3,265 sq ft, with prices from AED 1.79 million and a payment plan running to September 2029.

Silva at Dubai Creek Harbour at a glance

Home typeSize from (sq ft)Starting price
1 Bedroom Apartment (189 units)740AED 1.79M
2 Bedroom Apartment (186 units)1,154AED 2.65M
3 Bedroom Apartment (48 units)1,834AED 3.87M
3 Bedroom Townhouse (11 units)3,253AED 6.31M

Handover is estimated for Q3 2029. Starting prices are the lowest listed for each type and vary with floor, view and phase.

Silva residential tower by Emaar at Dubai Creek Harbour, render 2
Silva residential tower by Emaar at Dubai Creek Harbour, render 2 (developer render).

About Dubai Creek Harbour

Dubai Creek Harbour is a waterfront masterplan on the banks of Dubai Creek developed by Emaar Properties together with Dubai Holding. It sits beside the Ras Al Khor Wildlife Sanctuary, so residents get creek, skyline and, in places, flamingo-habitat views, with Downtown Dubai close by.

The district is also planned to host Creek Tower, designed by Santiago Calatrava. It has been announced as a landmark taller than Burj Khalifa, but completion targets have moved before, so treat it as a possible long-term upside rather than a reason to pay a premium today. Market guides report that one-bedroom apartments in the area sold at an average of roughly AED 1.8 million in mid-2025; always compare against the current price list.

What stands out at Silva at Dubai Creek Harbour

  • Green Gate District. A hidden gem of sprawling gardens beside the Ras Al Khor Wildlife Reserve.
  • 434 homes in four types. Apartments and townhouses with balconies and panoramic terraces.
  • Nature-fuelled wellbeing. Yoga hubs, running tracks, multi-sport court, pools and a kids' splash zone.

Amenities and lifestyle

Listed amenities include: Kids Play Area, Landscaped Parks, Retail & Dining, Picnic Area, Sports Courts, BBQ Areas, Communal Lawn, Jogging Track, Neighbourhood Plaza, Splash Pad, Sports Park, Swimming Pool, Table Tennis & Badminton, Yoga Zone.

Silva amenities and Green Gate park, render 1
Silva amenities and Green Gate park, render 1 (developer render).

Location and drive times

DestinationFrom Silva at Dubai Creek Harbour
Ras Al Khor Wildlife Sanctuaryabout 5 min drive
Downtown Dubaiabout 10 min drive
Dubai International Airport (DXB)about 15 min drive
Al Maktoum International Airportabout 40 min drive

Times are developer estimates by car in normal traffic. Check them at your own commute hours.

Silva private terrace with creek and skyline views
Silva private terrace with creek and skyline views (developer render).

Payment plan

The published plan (80/20) is:

  • Down Payment: 10% — On booking
  • 1st Instalment: 10% — Aug 2025
  • 2nd Instalment: 10% — Jan 2026
  • 3rd Instalment: 10% — Jun 2026
  • 4th Instalment: 10% — Mar 2027 (est. 40% construction completion)
  • 5th Instalment: 10% — Oct 2027 (est. 60% construction completion)
  • 6th Instalment: 10% — Apr 2028 (est. 80% construction completion)
  • 7th Instalment: 10% — Aug 2028 (est. 90% construction completion)
  • 8th Instalment: 20% — Sep 2029 (est. 100% construction completion)

Dates are the developer’s estimates and several may already have passed. If you are buying a specific unit, ask the seller or sales team which instalments are already paid and what is still due.

Early-stage purchase: protect yourself

Silva at Dubai Creek Harbour is at the launch or early construction stage (estimated handover Q3 2029). That usually means lower entry prices and longer payment plans, but also a longer wait. Make sure your payments go to the project’s RERA escrow account, that the sale is registered through Oqood, and that the contract states the handover window and the remedies if it slips.

Silva apartment interior, render 1
Silva apartment interior, render 1 (developer render).

Who is Silva at Dubai Creek Harbour for?

  • Investors and first-time buyers looking at the one-bedroom entry price and the rental market for smaller units.
  • Families and upsizers considering the two- and three-bedroom layouts.
  • Waterfront or skyline lovers who value the view and the surrounding community as much as the unit.

Golden Visa and residency

The UAE Golden Visa generally requires property worth at least AED 2 million. Larger units may reach that level, but how off-plan payments count towards that has changed recently and published sources disagree, so confirm the current rule with the Dubai Land Department or ICP before relying on it. See our Golden Visa guide.

Checklist before you reserve

  1. Ask for the exact unit’s floor, orientation and a view study.
  2. Request the current price list and a statement of instalments already due.
  3. Get the estimated service charge per sq ft.
  4. Confirm the escrow account and RERA project registration.
  5. Budget for the 4% DLD fee and agency or admin fees on top of the price.
  6. Check the contractual handover date and remedies for delay.

Compare with similar projects in Dubai Creek Harbour

See every Dubai Creek Harbour project, read more about Emaar Properties, or test returns in the ROI calculator.

Next step: see current prices, floor plans and the full payment schedule on the Silva at Dubai Creek Harbour project page, or talk to our team about availability.

This guide is general information, not financial or legal advice. Prices, availability, payment dates and handover dates come from developer materials and market sources and change often: confirm everything against the current price list, the sales and purchase agreement and official Dubai Land Department (DLD) and RERA sources before you pay a deposit.

Properties mentioned in this article

Frequently asked questions

How much does Silva at Dubai Creek Harbour cost?
Starting prices are AED 1.79M for a 1 bedroom apartment, AED 2.65M for a 2 bedroom apartment, AED 3.87M for a 3 bedroom apartment, AED 6.31M for a 3 bedroom townhouse. Confirm current availability and pricing with the sales team.
What is the Silva at Dubai Creek Harbour payment plan?
The published plan is 80/20, with 9 milestones. Dates are the developer’s estimates, and some may already have passed.
Where is Silva at Dubai Creek Harbour located?
In Dubai Creek Harbour: about 5 minutes to Ras Al Khor Wildlife Sanctuary; about 10 minutes to Downtown Dubai; about 15 minutes to Dubai International Airport (DXB).
When is Silva at Dubai Creek Harbour due for handover?
Estimated handover is Q3 2029. Dates are estimates and can change; confirm in your sales contract.